C48726 Up Line Structure Component Repairs on Broadway – 7th Avenue Line (IRT) and 8th Avenue Line (IND) and Stormwater Mitigation at 81st Street on Broadway – 7th Avenue Line (IRT), in the Borough of Manhattan.
Agency: | The New York State Contract Reporter |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD15621849906838125 |
Posted Date: | Oct 19, 2023 |
Due Date: | Nov 21, 2023 |
Source: | https://www.nyscr.ny.gov/ifram... |
Description: Description of Goods or Services to Be Bid :The Work for this Contract includes repair and replacement of structural members; repair of spall, crack, bridge bearing, brick facade; stabilize existing parapet wall; new concrete wall and stone work; rehabilitation of manholes; construct a new pump control room with electrical, communication, plumbing and HVAC; removal of the existing abandoned Circuit Breaker House (CBH) and installation of new protection railing; water remedy and waterproofing. This is an A+B Bidding Contract.
Pre-Bid Conference: Date: November 1, 2023 Time: 10:00 AM Location: Virtual via Microsoft Teams- Please contact the assigned procurement representative to register at tayon.tichards@mtacd.org
Site Tour: Location No. 1 Date: November 2, 2023 Time: 10:00 AM Location: Southbound Control Area R178, 145th St. Station, Broadway-7Ave. Line, in the Borough of Manhattan
Location No. 2 Date: November 2, 2023 Time: Immediately Following Location No. 1 Location: La Salle St. Bridge, Broadway-7Ave. Line, in the Borough of Manhattan
Solicitation Type: IFB Document Availability: 10/18/23 Document Cost: $0
Contract Term: 1127 Calendar Days Location: Ad Type: General
|
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.