Pit Tempering Furnace Solicitation
Agency: | DEPT OF DEFENSE |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159916707694578 |
Posted Date: | Mar 2, 2023 |
Due Date: | Mar 17, 2023 |
Solicitation No: | W911PT23Q0036 |
Source: | https://sam.gov/opp/72cbe35db5... |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Solicitation (Updated)
- All Dates/Times are: (UTC-05:00) EASTERN STANDARD TIME, NEW YORK, USA
- Updated Published Date: Mar 02, 2023 07:52 am EST
- Original Published Date: Feb 17, 2023 09:43 am EST
- Updated Date Offers Due: Mar 17, 2023 04:00 pm EDT
- Original Date Offers Due: Mar 17, 2023 04:00 pm EDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Apr 01, 2023
- Original Inactive Date: Apr 01, 2023
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 3424 - METAL HEAT TREATING AND NON-THERMAL TREATING EQUIPMENT
-
NAICS Code:
- 333994 - Industrial Process Furnace and Oven Manufacturing
-
Place of Performance:
Watervliet , NY 12189USA
1--PIT TEMPERING FURNACE
DUE DATE 17 MAR 2023
QUESTIONS ASKED/ANSWERS
1.Is there a minimum part size requirement? Per 5.3.2.8 Required Accessories, we are to provide a loading/unloading basket which can handle parts up to 33” dia. x 36” tall. We will need to supply a mesh liner for the basket if the smallest parts are capable of falling through the support grid.
Minimum part size is not a requirement at this time.
2.Are there approximate measurements of the existing furnace envelope? Does this include a pit or is the existing furnace above ground? Per 5.3.1 Furnace Envelope, the furnace must fit within the space of an existing furnace.
As per section 3.20.2, requesting an approximate floor plan of the offer including dimensions of the base of the furnace. I will compare them to the existing unit dimensions. This is installed in a pit on a raised structural steel platform, so it is critical that the unit meet height as well as foot print requirements. The foot print is composite shape so I would need to see the layout.
3.Is there an existing compressed air supply and if so, what is its capacity? Per 5.3.2.2 Cover, the cover shall be provided with a manually actuated hydraulic cylinder for lifting the cover. We typically use pneumatic cylinders to reduce the complications and costs of hydraulics.
There are not utilities for a pneumatically operated cover on the existing unit. The current unit is a manually operated, self-contained unit with a simple hydraulic cylinder similar to an automotive jack. If the cover mechanism requires compressed air for operation, it would probably not meet the specification.
Document | File Size | Access | Updated Date |
|
158 KB
|
Public |
Feb 17, 2023
|
|
500 KB
|
Public |
Feb 17, 2023
|
|
312 KB
|
Public |
Feb 17, 2023
|
|
31 KB
|
Public |
Feb 17, 2023
|
- ACC WATERVLIET ARSENAL 1 BUFFINGTON ST
- WATERVLIET , NY 12189-4000
- USA
- Brianne M. Denofio
- brianne.m.denofio.civ@army.mil
- Phone Number 5182664644
- Mar 02, 2023 07:52 am ESTSolicitation (Updated)
- Mar 01, 2023 11:58 pm EST Presolicitation (Inactive)
- Feb 17, 2023 09:43 am EST Solicitation (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.