Design Maintenance & Salt Storage Facility
Agency: | The New York State Contract Reporter |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD15621609178737352 |
Posted Date: | Oct 13, 2022 |
Due Date: | Nov 9, 2022 |
Source: | https://www.nyscr.ny.gov/ifram... |
Description: It is the intent of The State University of New York College at Brockport to hire a consultant to provide design services for a maintenance and salt storage facility. The campus stores its supply of snow/ice melt materials in a small wood framed, open-air structure adjacent to the canal at the west side of the Chapman Service Building (no. 35). Similarly, seasonal maintenance equipment is stored outdoors where it is continually exposed to the weather. That said, a new salt and maintenance storage facility(s) is needed to meet current environmental, life and safety standards, and to provide protection of our ground and maintenance equipment. Preliminary discussions include the use of prefabricated structure(s) located directly south of the Whited baseball/Softball Complex (at the previous campus laydown area) on Commencement Drive. The current contractor is cleaning up this laydown area/site and enhancing the berms. Included is the modernization and consolidation of the existing fuel dispensing equipment with a new above ground system at the west side of the Chapman Service Building. This work is to include the removal of the previously abandoned underground fuel storage tanks near the southeast area of Chapman and potential soil remediation. This shall be an accelerated design component and separate bid package for this project. Initial scope of services shall include a schematic study based on feedback gathered from the end uses, scoping recommendations and environmental testing. The consultant shall include comprehensive design services including but not limited to: Civil, Architectural, Structural, Engineering, Environmental, Land Surveying Services and Estimating. A review of the existing drawings and other information as well as a field visit(s) to confirm existing conditions are necessary as are design/interview meetings. Address College review comments during the various phases of the design process. The consultant shall prepare a comprehensive set of construction drawings and project manual(s) and prepare a comprehensive Topographic Survey of the proposed building/spoils site and the Chapman Complex. Varying degrees of bidding and construction administration support will be needed. Services shall abide by the design directives established by the campus and the State University Construction Fund.
The work includes:
Alternates shall include: in-slab heat with ground source heat pumps, roof mounted photovoltaic panels if a solid roof structure is decided. Please contact Mark Stacy, mstacy@brockport.edu, if you would like a copy of the RFQ. Due Date: 11/09/2022 3:00 PM Contract Term: Construction completion anticipated for August 2024. Location: SUNY Brockport Ad Type: General
|
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.